I’ve fairly stringent SLAs with my buyer so I’m getting further Web insurance coverage.

I’ve two DIA circuits to 2 numerous suppliers, numerous entry factors into the constructing and numerous paths all the way in which to the suppliers POPs. I’m doing BGP to every and promoting out a /24 so I really feel fairly assured within the resiliency of this design however I’m actually adversarial to taking a SLA hit.

I’m curious if I used to be so as to add two cradle factors and BGP peer with the cell suppliers and promote out the /24 as a 3rd and fourth backup possibility is even doable and if anybody has completed this.

TIA